Civil protection
Equipment for situations where time is what counts
Machines for filling flood sandbags quickly and bagging materials for relief work. Built around the conditions they are to work in — outside the workshop, often without mains power.
What this part of the range is
Emergency equipment is machinery meant to work where an operation is under way: at an embankment, in a yard, at a relief collection point. The core is bag-filling machinery — flood sandbags filled with sand, and bagging of bulk materials for humanitarian purposes.
Filling a bag by hand takes two people and the best part of a minute. Building an embankment is not about a single bag but about a pace held for hours — and that is the only reason such a machine makes sense. It does not replace people; it lets them work longer without losing pace.
Everything in this group is built to order. We start with three questions: what is being filled, under what conditions, and how the equipment reaches the site. Those answers shape the design more than anything else.
What shapes the design
Transport without a crane
Weight and dimensions chosen so that setting up does not need equipment that will not be there.
Generator operation
There is rarely a socket at the scene, so running from a generator is the default assumption.
Operation learned in minutes
Volunteers seeing the machine for the first time help during an operation. Nobody reads a manual.
Our own production
We are a manufacturer, not a reseller — the design follows the task instead of being picked from a catalogue.
What it consists of
Beyond bag filling itself, the group covers supporting equipment without which a filling station does not run smoothly:
- Receiving hoppers — take material from a loader and feed it in a controlled way.
- Conveyors — bring material to the station so that nobody carries it by shovel.
- Multi-station sets — several filling points side by side when one cannot keep up.
- Heat sealers and bag-closing sewing machines — where a bag is to be closed, not just filled.
The arrangement follows the task: from a single machine to a station worked by several people at once.
Frequently asked questions
How many bags an hour does such a station fill?
It depends on the design, the material and the number of people at the station — dry and wet sand behave quite differently. Throughput is agreed at the ordering stage; we do not quote a single figure for all cases because it would be misleading.
Does the equipment work without mains power?
Yes, and that is the default assumption. Power requirements are stated for the specific configuration so that a generator can be matched.
How is the equipment stored between operations?
That is one of the first questions we ask — storage sets the permissible dimensions and the way the machine is protected. Equipment standing for a year in an unheated bay is designed differently from one working every week.
Can it be purchased through public procurement?
Yes. We prepare a technical description for the procedure — please get in touch while the documentation is still being drafted, while there is time to establish what is realistically achievable.
Does the equipment meet the requirements of the OLiOC programme?
Requirements differ depending on the tender and the intended use. Scope, parameters and the way they are demonstrated are agreed individually at the ordering stage — please get in touch describing what is to be carried out and we will answer directly what we are able to supply.
Tell us what is to be carried out
We will answer directly what we can supply and by when. No obligation.
